Sample Work & Drafting Standards
The standards every Leger Drafting sheet is held to, shown on reference sample sheets. Client drawings are confidential and never published here.
Reference sample sheets
Each sheet below is an illustrative reference drawn to show drafting style and conventions. They are not client drawings and not for construction.
Reference sample sheet Motor control schematic
Ladder layout with line references, wire numbers on every node, and coil-to-contact cross-references so a technician can trace the circuit.
Reference sample sheet Control panel backplate layout
Components drawn at true footprint with wire duct and DIN-rail spacing, overall dimensions, and a BOM that matches every tag on the plate.
Reference sample sheet Instrument loop diagram
One loop per sheet, laid out field to junction box to panel, with ISA-style tag bubbles, cable and pair numbers, terminal points and I/O channel.
Reference sample sheet Terminal strip schedule
Every terminal accounted for, with internal and field wire numbers that match the schematic, the source device and the outgoing cable. Spares are listed, not left blank.
Drafting standards on every sheet
Your company standard always comes first. Where there isn’t one, these are the defaults.
-
Layer organization
Every drawing uses a predictable layer structure so your team can isolate, plot and edit without hunting. Geometry stays off layer 0, colors and lineweights follow the standard, and files are purged and audited before delivery.
Example structure. Your layer standard takes priority.Layer Content E-WIRE Conductors and wire links E-DEVC Device symbols E-TAGS Device tags and wire numbers E-TEXT Notes and annotation E-DIMS Dimensions G-BRDR Border and title block -
Title blocks
Title blocks carry what people actually look for: client, project, drawing number, sheet count, revision and approvals. Fields are attribute-driven, so a revision or date change updates across the whole set together.
Client Plant or site name Project Project or work order Drawing no. E-101 Sheet 3 of 12 Revision B, issued for construction Drawn by JLL -
Wire and device tagging
Wire numbers and device tags follow one convention through the whole set, JIC/NFPA 79 or IEC 81346 style, matched to your plant. Coils and contacts are cross-referenced by line number, so a circuit can be followed across sheets.
Tag Meaning 101 to 104 Line references on sheet E-101 M1 Motor starter, coil on line 101 M1 (102, 103) Contacts, cross-referenced PB1 / PB2 Stop and start pushbuttons 4 Wire number, same at both ends -
BOM clarity
Every device on the drawing has a matching BOM line: tag, quantity, manufacturer, catalog number and description. In AutoCAD Electrical and EPLAN the BOM is generated from the drawing rather than typed separately, so the two stay in sync.
Field Example Item 3 Tag K1 Qty 1 Mfr / catalog Per approved vendor list Description 3-pole contactor, 120 VAC coil -
Redline-to-CAD accuracy
Every markup is picked up and checked off. Changes are clouded with a revision delta, the revision block is updated, and the new sheet is checked against the original redline before it goes back to you. Anything unclear is asked about, not guessed.
- Markups logged sheet by sheet
- Each change clouded with a delta
- Revision block updated
- Back-checked against the redline
- Open questions flagged to you
Want your drawings held to this standard?
Send your markups or specs for a written quote, or call 337-405-8774.